  • Phase 0 — Foundation 2026-05-01
    The plan What I'm building, why, and where it stands after the first week. A homelab, a personal vault, a design agent pipeline, and a site to document all of it.
    homelabobsidiann8narchitecture
  • PHASE 5b — Design system: client design system + Penpot bidirectional 2026-05-31
    One month in — plan vs. reality The original plan had seven phases laid out in a table. A month in, five are done and the remaining two look different than expected. Here's what actually happened.
    architectureretrospectivehomelabai