#documentation
2 posts
- PHASE 4B — n8n design agents 2026-05-30A/B Results Logged: Groq Replaces Claude in the Critique Loop The A/B test between Groq qwen3-32b and Claude on design critique is documented and closed. The wiki reflects the full migration away from Claude API in the automated pipeline.
- PHASE 5b — Design system: client design system + Penpot bidirectional 2026-05-31CLI Loop Documented — Brief to Penpot Frame in One Pass The full CLI workflow is now written up — every command from briefv2 to penpot-token-sync, with a walkthrough that covers the complete loop from client brief to refined Penpot frame.